Concrete pump pipe calculation method

The concrete Pump pipe is a very easy to damage pipe fitting. If some concrete Pump pipe are damaged after replacement, let us introduce the precautions when replacing.
1. Make a chute according to the discharge port of the mixing machine and the hopper of the wear-resistant pump pipe machine, so that the material discharged from the mixing machine and the machine can enter the hopper of the pump through the chute.
2. In the placement of the chute, the slope is required to be appropriate, and the inclination angle is preferably between 25° and 40°, and the drop is not too large.
3. When the chute is connected with the pump hopper, the chute and the hopper should have a certain space to facilitate cleaning the hopper and the sieve.
4. First place the concrete pump on a solid concrete floor or stone pier, maintain the degree, and lock the positioning pins of the four legs of the pump and the safety pin to make the tire off the ground or remove the tire.
5. Under normal circumstances, it is necessary to raise the height of 20CM on the hopper of the wear-resistant concrete Pump pipemachine, so as to increase the volume of the hopper to ensure that the concrete will not flow out. Because the forced mixing machine and the unloading of the machine are preferably discharged at one time, the concrete flowing into the hopper is more uniform. If the material is discharged in several stages, the last concrete stone is too much, and the pumping is unlucky, especially when the slump of concrete is large, it should be noted that the hopper of the pump should be raised. If it is a large-volume mixing machine, a storage hopper can be made in advance to ensure continuous feeding.
6. The chute is usually made of angle steel and welded with 1.5mm thick steel plate. The bottom of the chute is supported by a support to make it firm.